国产精品欧美一区二区三区-欧美极品一级黄精品观看-日本熟女熟妇一区二区-国产亚洲欧洲一区二区三区

Your Position: Home > News > Activities

Daily Maintenance and Replacement of Roots Pump of Oil Filter

2019/8/1??????view:

  1. Regular inspection

  1.1. Daily check:

  (1) Oil level check: check the oil level of gear box and bearing box, too much oil level of gear box and bearing box, oil temperature will rise; too low oil level will cause poor lubrication of gears and bearings.

  (2) Temperature Check: Check the temperature of each part with a thermometer.

  (3) Motor load inspection: measuring motor load with power meter or current and voltmeter.

  1.2, monthly check: tension of coupling elastomer or triangular tape.

  1.3, quarterly inspection; Whether the lubricating oil in the gearbox is deteriorated or not.

  1.4. Semi-annual inspection:

  (1) Whether the lubricating oil in the bearing box of the front cover deteriorates.

  (2) Whether the mechanical seal is damaged or not.

  1.5. Check every year:

  (1) Whether the bearing is worn or not.

  (2) Whether the piston ring and piston ring bushing are worn or not.

  (3) Whether the micro-wear of gears has an effect on the normal operation of the rotor needs to be adjusted.

  2. Attentions for disassembly and assembly: Roots vacuum pump should be disassembled and reassembled according to the following precautions:

  2.1 Before disassembly, the clearances of the main and driven rotor parts must be measured and recorded.

  2.2. When disassembling, it is necessary to avoid hammering parts directly with heavy hammer. The disassembled parts should not be bruised, and should be cleaned and properly kept.

  2.3. The reasons and circumstances for the replacement of the parts to be replaced are recorded in detail.

  2.4 Before reassembly, all assembly parts must be burred and cleaned.

  2.5. The static sealing plane without gasket or sealing ring is sealed with "106" silicone rubber coating. The rubber seals used for static sealing can be coated with vacuum grease.

  2.6 The clearance of the main and driven rotors can be adjusted according to the clearance before the dismantling of the pump.

  2.7. Leakage test must be carried out after all are installed.

  2.8. After reinstallation, commissioning and necessary performance testing should be carried out before normal operation.

  3. Pump disassembly steps:

  Before removing the pump, drain the accumulated water in the pump and lubricating oil in the tank and cut off the main power supply.

  3.1. Remove the fixed end:

  1) Loosen the fastener between the motor and the motor connecting frame, then unload, refuel plug, lower motor and motor connecting frame.

  2) Remove the shaft seal (mechanical seal) pressure cap, the oil retaining disc, the garden nut and the shaft seal pressure cap.

  3) Remove the seals of the mechanical seals; (Replace the piston ring seats of the mechanical seals and install the new active shaft of the mechanical seals after 1-3 steps. );

  4) Remove the front cover; (Replace the whole set of mechanical seals, after completing 1-4 steps of piston ring, install new mechanical seals. ) Balanced mechanical seals

  5) Loosen the round nut and oil disc for the shaft; Bearing cap and ball bearing.

  6) Remove bearing cap; front cap, front cap and drain plug.

  7) Remove the bearing cap and bearing from the end cap (replace the bearing).

  Press out protective sleeve;

  Pull out the rotor and dismantle the pump.

  If Roots vacuum pump with bypass valve is used, the pressure cap of bypass valve should be removed, the valve head of bypass valve should be taken out, and the movement of the guide sleeve and the hole of the valve head should be checked for flexibility and reliability of the sealing ring.

  4. Pump loading steps:

  Before loading the pump, all parts should be cleaned and burrs removed. Attention should be paid to the sealing surface should not be oiled.

  1) Put a pair of rotors into the pump body, pay attention to the position of the long and short axis rotors, and insert a plug ruler in this position.

  2) Apply a thin layer of 106 silicone rubber evenly on the contact plane between the end cap and the pump body at both ends, and tighten the screws.

  3) Install piston ring and piston ring bushing and oil shield, and adjust the schematic diagram of rotor clearance.

  Install bearing seat, bearing and bearing locking nut and bearing pressure cap (the original removal adjustment gasket is placed in place under the fixed end bearing seat, and the bearing seat is fastened);

  Silicone rubber and tighten the front cover;

  Roots vacuum pump with bypass valve shall be equipped with relief valve head and pressure cap.

  After installing the mechanical seal cap, the coupling is installed on the active shaft. The manual disc-driven coupling should rotate flexibly and not be stuck. Finally, the motor connecting frame and motor are installed. If it is possible to test the air tightness of the pump, the dry air of 0.2-0.3 MPa can be injected into the pump, and soap liquid is applied on the sealing surfaces to check whether there is air leakage. After installing the oil discharging bolts, the pump is refuelled, and the oil level is generally about 3/4 of the oil window. Connect the power cord, the water pipe and the air inlet cap of the pump. Start the pump, pay attention to steering, if necessary, test the performance of the pump.


自拍视频在线观看后入| 日韩精品一区二区三区夜色| 日本高清免费黄色录像| 极品人妻美妇一区二区三区 | 亚洲激情中文字幕电影| 天堂蜜桃视频在线观看| 国产精品三级三级三级看三级| 国产一区二区三区影院在线观看| 欧美黄片不用下载在线观看| 国产精品老熟女一区二区| 亚洲精品一区三区三区在| 免费国产不卡在线观看| 亚洲视频在线的视频在| av成人免费在线视频| 欧美日韩免费一区中文字幕| 久久精品中文字幕有码| 伊人狼人视频在线观看| 一区二区三区在线日本在线视频| 一本在线不卡中文字幕| 国产精品剧情在线播放| 国产不卡三级在线播放| 精品国产精品三级在线专区| 日韩黄国产一区二区三| 国产免费av高清在线| 99久久精品看国产一区| 亚洲成人午夜激情的三级网| 精品三级国产三级在线专区| 日本一二三区免费在线| 精品国产一区二区二三区在线观看| 声入人心第一季在线观看| 国产成人午夜在线视频| 国产欧美另类久久精品9| 国产呦精品一区二区三区 | 国产精品蜜汁内射视频| 国产在线不卡免费视频 | 天天操夜夜操白天操晚上操| 久久久精品一级黄色片| 久久伊人精品色婷婷国产| 黄色国产精品福利刺激午夜片| 午夜看片国产操黑丝91网| av成人免费在线视频|