国产精品欧美一区二区三区-欧美极品一级黄精品观看-日本熟女熟妇一区二区-国产亚洲欧洲一区二区三区

Your Position: Home > Support > Service Center

Notes for reuse of Lyboa pump of ZYD transformer oil filter

2019/8/1??????view:

  The pump must be stored in a dry place before it returns to the workplace again. Better at room temperature (200C). Before the pump is withdrawn from the workplace, it should be removed from the vacuum system, washed with dry nitrogen and replaced with oil. The inlet and outlet of the pump must be sealed with the shipping seals at the time of delivery. The gas town must be closed. If the pump is idle for a long time, it should be sealed with plastic bags and desiccant.

  If the pump has been idle for more than a year, it must be maintained in a standard way and oil must be changed before the pump is put into operation again. We recommend that you contact the LEYBOLD manufacturer for maintenance services.

  Standard pumps are not suitable for installation in explosive dangerous areas. Please contact us when you intend to apply this method. Before installing the pump, it must be reliably disconnected from the power supply in order to prevent accidental start-up of the pump. Pumps can only be installed by qualified and well trained personnel. All safety regulations should be observed.

  Installation of ZYD oil filter Lyboa pump for reuse:

  In order to ensure safe start-up, it is necessary to proceed step by step according to the following instructions.

  The start-up can only be carried out by trained full-time personnel.

  SOGEVAC can be installed on any flat, horizontal plane. Under the four legs, there are metric threaded holes for fixing pumps.

  If the pump is inclined, the oil level can not be correctly read out. The pump is in danger of running dry.

  According to the different use of oil, the ambient temperature of the pump should be between 12 (55) and 40 (104). By improving the pump or replacing different types of oil, the pump can operate at lower ambient temperature. Please consult us about these questions.

  In order to ensure a good cooling of the pump, there should be enough space in the intake and exhaust outlets for maintenance and repair. Make sure the motor air intake is clean and clean.

  1. Connect to the system

  Standard pumps are not suitable for installation in explosive dangerous areas. When you plan to do so, please consult us. Before installing the pump, it must be reliably cut off from the power supply to prevent unintentional starting of the pump. The pump can only be installed by qualified and trained professionals.

  Comply with all safety regulations.

  2. Inlet side

  The intake flange of the pump is connected by internal threads. The pump can be connected to the vacuum system with suitable connectors.

  The cross section of the intake pipe should be at least the same as that of the intake port. If the intake pipe diameter is too small, the pumping speed will be reduced.

  We recommend using LOCTITE or TEFLON tape for threaded joints to ensure vacuum sealing. (especially when dangerous gases)

  3. Installation Warning of ZYD Oil Filter Lyboa Pump

  The pump should be connected to the intake pipe without any stress. Hose or pipe fittings are used in intake and exhaust pipes for easy removal during pump maintenance.

  - The maximum import pressure shall not exceed atmospheric pressure (about 1013 mbar). When there is excessive pressure in the import, the pump shall not be started.

  - The type of material used in the installation of pipes should take into account the type of gas pumped. The same is true for seals.

  If the process gas contains dust, dust filters must be installed in addition to random dust filters. We recommend that dust filters be installed horizontally with tees (3/13) or elbows (3/14). This ensures that no dust particles fall into the intake when the filter is removed. Import filters with different filter elements. Metal filter can prevent solid particles such as paper and plastics from entering the pump; paper filter can remove small particles such as dust and powder less than 1 micron; activated carbon filter can absorb chemical vapor such as acid and solvent. If the activated carbon filter is stored in a humid place, it should be dried at 212 for 2 hours before use.

  When extracting steam, we recommend installing condensers at the inlet and outlet sides.

  When pumping dangerous gas, the intake pipe must be tight.

  Solid particles or liquids are never allowed to enter the pump.


国产成人午夜视频在线| 国产精品亚洲国产精品| 欧美精品久久91九色| 国模午夜写真福利在线| 国产av专区久久伊人亚洲| 中文字幕手机在线日韩免费| 亚洲毛片免费视频久久| 蜜桃成人精品一区二区三区| 欧美日韩av在线一区二区| 亚洲天堂网无吗在线视频免费观看 | 91香蕉视频看片网站| 韩国成人伦理片在线观看| 亚州国产精品久久久久久| 婷婷av一区二区三区| 未满十八周岁禁看视频| 亚洲va久久久噜噜噜久久狠| 国产精品久久久久久老熟女| 精品国产欧美日韩在线不卡| 日韩免费av在线免费观看| 韩国av在线免费观看| 国产激情一区二区三区不卡| 少妇视频一区二区三区| 日韩中文字幕熟女人妻| 中文字幕日本在线乱码| 国产一级黄色大片在线| 亚洲午夜精品免费视频| 亚洲不卡一区二区三区不卡| 一本大道东京热加勒比| 刚为人妻的黑丝美女少妇| 亚洲av色香蕉一区二区三区老师 | av中文资源在线观看| 初尝人妻少妇中文字幕在线| 日本熟女视频免费观看| 国产一区二区三区91精品| 青青草网站在线观看视频| 国产精品亚洲av无人一区| 人妻丰满精品一区二区三区| 91久久国产亚洲精品| 成年人av毛片在线观看| 日本女优一区二区三区在线| 亚洲欧洲日本在线天堂|